Sunday, June 21, 2015

The Kitchen Journey, Day 20

Progress has been ongoing - slow, but ongoing. This week the new track lighting was installed. The electrician didn't much enjoy installing it, but he got it done.


Because of the structural beam and the fact that ceiling and roof are not very far apart in this place, we are limited as to where/how we can put lighting. This track light system will fit our needs well by allowing us to move the 3 short lights along the cables and tilt them to provide countertop lighting, and the longer light on each end is adjustable downward to provide lighting to the other side of the danged structural beam.

Tomorrow the rest of the caulking on the floor will be completed, and the cabinets are scheduled to arrive on Tuesday.

There is a light at the end of the tunnel, little ones, and it just might not be a train. ;)

No comments: